| Capital Projects Home Page |
|---|
| Division 2 Sitework |
|---|
| 2-15 | Landscaping |
| A. | Site Restoration |
| All disturbed surfaces shall be restored to their original condition, including destroyed or defaced traffic or parking paint striping. At lawns and planted areas, backfill the final 12" with an approved garden-grade loam. In each case obtain the requirements for preparation, fertilizing, planting and plant materials from Capital Projects (CP). |