New Century Plan Home
About the Plan Strategic Goals Project Portfolio Project Guidelines Project Approval Download & Print
Project Portfolio
Area E Area D Area G Area F Area C Area B Area A Area G Area F Area E Area D Area C Area B Area A

B1 B2 B3 B4 B7 B5 B6


Download & Print
Download & Print

Area B Concepts




B1 North Gate  Top
Preserve the unobstructed view of Doe Library from Observatory Hill. Repave and refurnish the entire length of Sather Road in materials commensurate with its role as the primary route through campus.


B2/3 Observatory Hill  Top
Consider a new building composed of a matched pair of pavilions above grade, with linked contiguous floors below grade.

Design the new pavilion facing the Central to reinforce and enhance the integrity of the classical core.

Design the new pavilion at North Gate to create a graceful transition from the classical core to North Gate Hall. Provide consolidated service access from University Drive.


B4 Strawberry Creek Renewal  Top
Develop and implement a management and phased restoration program for the creek and its riparian landscape, based on ecological principles as described in strategic goal 1.


B5 West Oval Glade  Top
Relandscape the section of creek within the Glade with native riparian plants, and widen the streamcourse.


B6 Moffitt Terrace  Top
Redevelop the east terrace of Moffitt Library as an active, day and night place for study and social interaction.

Incorporate an architectural 'beacon' on axis with Sather Road and East Gate.


B7 Wellman Courtyard  Top
Remove the temporary structures, and relandscape the courtyard as a casual social place and sculpture garden.

Consider developing a new building at the north end, compatible in style and scale with the existing buildings.


Illustrative Landscape Area B

Illustrative Landscape
Area B


Top  Top


Previous  Area A

Area C  Next


Capital Projects | UC Berkeley
Copyright 2002 UC Regents. All Rights Reserved.