Concept : Mining Circle
Concept:
The Mining Circle returns as the crossroads of the northeast campus and a grand forecourt to the magnificent Hearst Memorial Mining Building. Replacement of Evans Hall by new twin pavilions restores the historic view to the Golden Gate.

This section presents brief descriptions of each potential building and landscape/open space investment represented in the Campus Vision. The project descriptions are conceptual: The buildings shown are prototypes, based on modular dimensions adaptable to a range of university functions. However, they are configured to respect and enhance spatial and architectural relationships, and frame adjacent opens spaces and walkways, and are meant to inform the design of future projects by presenting concepts consistent with the Strategic Goals.

This portfolio is deliberately broad and ambitious. Given the limits imposed by both resources and logistics - we can only accommodate so much construction at once - the campus must be selective and realistic in formulating its capital investment plan. What is crucial, however, is that new building and landscape/open space improvements are planned together, to ensure each new investment elevates the quality of campus life.